Difference between revisions of "Case Study Technical Committee"
From COST Action FP0804: FORSYS
SeanGordon (Talk | contribs) m (moved Case Study Committee to Case Study Technical Committee) |
SeanGordon (Talk | contribs) m |
||
Line 2: | Line 2: | ||
The Case Study Steering Committee is composed of members from all the four working groups: | The Case Study Steering Committee is composed of members from all the four working groups: | ||
− | * Chair: Sean Gordon (USA) sean.gordon<at> | + | * Chair: Sean Gordon (USA) sean.gordon<at>pdx.edu |
− | * Vice-chair: Ljusk Ola Eriksson (Sweden) | + | * Vice-chair: Ljusk Ola Eriksson (Sweden) Ljusk.Ola.Eriksson<at>slu.se |
− | *WG 1 Maarten Nieuwenhuis (Ireland) | + | *WG 1 Maarten Nieuwenhuis (Ireland) maarten.nieuwenhuis<at>ucd.ie |
− | *WG 1 Luiz Rodriguez (Brazil) | + | *WG 1 Luiz Rodriguez (Brazil) lcer<at>usp.br |
− | *WG 2 Tomas Lämås (Sweden) | + | *WG 2 Tomas Lämås (Sweden) Tomas.Lamas<at>srh.slu.se |
− | *WG 3 Antonio Floris (Italy) | + | *WG 2 Jordi Garcia (Spain) jordigarcia<at>isa.utl.pt |
− | *WG 4 Luc Boerboom (Netherlands) | + | *WG 3 Antonio Floris (Italy) antonio.floris<at>entecra.it |
+ | *WG 4 Luc Boerboom (Netherlands) boerboom<at>itc.nl | ||
The responsibilities of the Case Study STC are: | The responsibilities of the Case Study STC are: |
Latest revision as of 06:51, 12 November 2012
The Case Study Steering Committee is composed of members from all the four working groups:
- Chair: Sean Gordon (USA) sean.gordon<at>pdx.edu
- Vice-chair: Ljusk Ola Eriksson (Sweden) Ljusk.Ola.Eriksson<at>slu.se
- WG 1 Maarten Nieuwenhuis (Ireland) maarten.nieuwenhuis<at>ucd.ie
- WG 1 Luiz Rodriguez (Brazil) lcer<at>usp.br
- WG 2 Tomas Lämås (Sweden) Tomas.Lamas<at>srh.slu.se
- WG 2 Jordi Garcia (Spain) jordigarcia<at>isa.utl.pt
- WG 3 Antonio Floris (Italy) antonio.floris<at>entecra.it
- WG 4 Luc Boerboom (Netherlands) boerboom<at>itc.nl
The responsibilities of the Case Study STC are:
- To agree on general guidelines and procedures for the work (see Case Study Guidelines)
- To be in touch with members of their WGs and send out requests/receive information
- To keep track of the work already done in the WGs concerning success criteria, conducted STSMs, etc.
- To support the work in general
For more details, see Case Study Committee Workplan