Here are some ideas for your feedback:
+
==Before the Leuven 2011 meeting==
 
+
==Desired result of Nov 2011 case study activities==
+
* Agreement on the outline of a common plan for conducting the case studies, including decisions on purposes, methods (case definition, sampling, analysis), and reporting results
+
 
+
 
+
==What should the case study STC do before, at, and after the November meeting?==
+
 
+
Before the Nov meeting
+
 
*Plan the Nov 2011 case study activities
 
*Plan the Nov 2011 case study activities
 
*Develop two (or more) documents:  
 
*Develop two (or more) documents:  
Line 19: Line 11:
 
** Other relevant literature (methods, etc)
 
** Other relevant literature (methods, etc)
  
At Nov meeting
+
==At Leuven 2011 meeting==
 
* Give case study introductory presentation
 
* Give case study introductory presentation
 
* Lead each subgroup on assigned task
 
* Lead each subgroup on assigned task
  
After Nov meeting
+
==After Leuven 2011 meeting==
 
* Synthesize information into case study guidelines
 
* Synthesize information into case study guidelines
 
* Distribute the guidelines to the Forsys network
 
* Distribute the guidelines to the Forsys network
 
* Track progress of countries in Forsys network
 
* Track progress of countries in Forsys network
 
* Answer questions, resolve issues
 
* Answer questions, resolve issues
 
==Case study time at meeting==
 
'''How to maneuver the November meeting discussions/work if we are something like 35 persons with 2 rather big rooms at our disposal (and perhaps smaller groups can find some space in the surroundings as well)? Having a common discussion all along might be difficult (or not so productive). Depending on how we divide the sessions, one may start thinking about how to compose the guidelines out of your material.'''
 
 
*[30 minutes] begin with a brief common presentation and discussion on progress to date. Outline tasks for meeting subgroups (overall task is to build more details on framework for conducting case studies). Answer any general questions.
 
*[1.5 hours] Break into ~4 subgroups with ~8 people each, trying to get even representation from each WG in each, including one of us in each (because it looks like case studies have already been discussed by each WG in Greece, now we could try to synthesize across WGs). All groups would have the same assignment: to review the current state of the case study framework, provide feedback, and develop more detail.
 
*[30 min] Groups would report a summary of their suggestions back to whole group
 
*[30 min] Synthesis discussion
 

Revision as of 02:09, 7 October 2011


Before the Leuven 2011 meeting

  • Plan the Nov 2011 case study activities
  • Develop two (or more) documents:
  • Gather further information on case studies
    • Existing forest DSS case study literature
    • Other relevant literature (methods, etc)

At Leuven 2011 meeting

  • Give case study introductory presentation
  • Lead each subgroup on assigned task

After Leuven 2011 meeting

  • Synthesize information into case study guidelines
  • Distribute the guidelines to the Forsys network
  • Track progress of countries in Forsys network
  • Answer questions, resolve issues