Difference between revisions of "Case Study Committee Workplan"

From COST Action FP0804: FORSYS
Jump to: navigation, search

Warning: require(): Unable to allocate memory for pool. in /data/home/fp0804/www/wiki/includes/AutoLoader.php on line 1191
m
Line 3: Line 3:
  
 
==Before the Leuven 2011 meeting==
 
==Before the Leuven 2011 meeting==
*Plan the Nov 2011 case study activities
 
 
*Develop two (or more) documents:  
 
*Develop two (or more) documents:  
 
** [[Case Study Notes by Research Phase]]: organize information already generated about the case study guidelines
 
** [[Case Study Notes by Research Phase]]: organize information already generated about the case study guidelines
Line 15: Line 14:
 
* Give case study introductory presentation
 
* Give case study introductory presentation
 
* Each STC member leads a subgroup on assigned task
 
* Each STC member leads a subgroup on assigned task
 +
* Develop & present a time line for the work on the case studies
 +
** incl. meeting of the STC
 +
** incl. clear division of responsibilities
  
 
==After Leuven 2011 meeting==
 
==After Leuven 2011 meeting==
* Synthesize information into case study guidelines
+
* Synthesize information and finalize case study guidelines
 
* Distribute the guidelines to the Forsys network
 
* Distribute the guidelines to the Forsys network
 
* Track progress of countries in Forsys network
 
* Track progress of countries in Forsys network
 
* Answer questions, resolve issues
 
* Answer questions, resolve issues

Revision as of 06:03, 7 October 2011


Before the Leuven 2011 meeting

  • Develop two (or more) documents:
  • Gather further information on case studies (STC sends request to country representatives)
    • Existing forest DSS case studies
    • Potential forest DSS case studies
    • Other relevant literature (methods, theories, etc)

At Leuven 2011 meeting

  • Give case study introductory presentation
  • Each STC member leads a subgroup on assigned task
  • Develop & present a time line for the work on the case studies
    • incl. meeting of the STC
    • incl. clear division of responsibilities

After Leuven 2011 meeting

  • Synthesize information and finalize case study guidelines
  • Distribute the guidelines to the Forsys network
  • Track progress of countries in Forsys network
  • Answer questions, resolve issues