Property:Allows value

From COST Action FP0804: FORSYS
Jump to: navigation, search
Allows value is a predefined property (also known as special property). It is a built-in property that comes with additional administrative privileges but can be used just like any other user-defined property.

Pages using the property "Allows value"

This property is a special property in this wiki. Showing 25 pages using this property.

(previous 25) (next 25)

H

Has NWFP DSS integration +An objective variable or constraint in optimization or in MCA analyses  +, User can predefine the treatments of stands that are important for NWFPs or MPTs e.g. through GIS operations  +, Expert can evaluate alternative solutions within DSS from the perspective of NWFP/MPT product(s)  +,
Has NWFP output variable +average yield (e.g. kg/ha/a)  +, value of the yield (e.g. €/ha/a)  +, indicator (e.g. absolute or relative goodness of the forest for NWFP in question)  +,
Has NWFP presentation +Preformatted tables and figures  +, Visualization e.g. through thematic maps  +, Trade-offs between other forest uses (e.g. production possibility frontiers)  +
Has NWFP uncertainty +deterministic  +, analysis related to uncertainties or stochastic nature of the yields are possible  +
Has accessibility +N/A  +, open source/public access  +, restricted access  +
Has adaptation effort +N/A  +, parametrised by the user  +, parametrised by the supplier  +,
Has data mining +N/A  +, artificial neural networks  +, regression trees  +,
Has data validation +N/A  +, missing/wrong data  +, error handling  +,
Has database +N/A  +, Excel  +, Access  +,
Has decision stage +organization  +, intelligence  +, design  +,
Has deployment cost +N/A  +, 0  +, <= 100€  +,
Has flag +N/A  +, red  +, yellow  +,
Has forest management goal +afforestation management  +, biodiversity evaluation  +, biomass estimation  +,
Has input data format +text file  +, XML  +, database  +,
Has institutional framework +N/A  +, research prototype (R&D project)  +, research prototype (student thesis)  +,
Has internal data management +database  +, memory only  +, temporary files  +
Has issue priority +1-high  +, 2-medium  +, 3-low  +
Has issue type +Bug  +, Suggestion  +
Has map interface +N/A  +, 2D  +, 2.5D  +,
Has method for design and requirement phase +UML  +
Has modelling scope +Economical indicators  +, Forest indicators  +, Ecological indicators  +,
Has number of real-life applications +N/A  +, 0  +, <=3  +,
Has number of users +N/A  +, 0  +, <=3  +,
Has optimisation package +N/A  +, AIMMS  +, COIN-OR  +,
Has output data format +text file  +, XML  +, table  +,
(previous 25) (next 25)