Pages that link to "Specification"
From COST Action FP0804: FORSYS
The following pages link to Specification:
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)- Users preferred enhanced functionality rather than useability (← links)
- The fact that ProgettoBosco is conceived according to the criteria and indicators of sustainable (← links)
- The definition of standardized and specific criteria for selecting and zoning forest compartment (← links)
- The ProgettoBosco working methodology, based on cooperation, successive approximations and (← links)
- The adoption of the collaborative learning method made possible to gradually select the conceptual (← links)
- A financial analysis is an important component in the discussion about the preferences of different (← links)
- It would have been better to involve some end users at earlier stages of the system development (← links)
- To compare the current and the past quantitative-qualitative parameters of the forest, great effort (← links)
- To meet the needs of customer - the Forest Service - and to obtain satisfying results the (← links)
- Afforestion and deforestation options should be included in the management options (← links)
- Providing procedures and structure for data flow from selection of field sample, performing field (← links)
- The DSS models built must match the knowledge of the local forest managers, so the ability for local (← links)
- Provide procedures and structure for complete data flow (← links)
- It is necessary to know which data will be use as variables in the models before designing the DSS (← links)
- Need of flexibilization of analytical tools - no overdesigned tool that provides too much features for the use (← links)
- Using Actor Network Theory in the design stage can help in understanding the dynamism of the network (← links)
- ATestCase (← links)
- Case Lessons by DSS development stage (← links)