Difference between revisions of "ProgettoBosco"
Line 62: | Line 62: | ||
* Choice (+ explicit description of the support given by the DSS) | * Choice (+ explicit description of the support given by the DSS) | ||
* Monitor (+ explicit description of the support given by the DSS) | * Monitor (+ explicit description of the support given by the DSS) | ||
+ | |||
+ | Simon's decision making model holds four phases | ||
+ | |||
+ | 1.Intelligence phase | ||
+ | Consist on surveying the environment for situations that demand decisions. It implies an identification of the problem(s), the collection of information and the establishment of goal and evaluative criteria. | ||
+ | 2.Design phase | ||
+ | Involves delineating and analyzing various courses of action for the problem identified in the intelligence phase. It implies an enumeration of a combination of feasible alternatives and their evaluation on the basis of the criteria established in the intelligence phase. | ||
+ | 3.Choice phase | ||
+ | Involves selecting the best alternative. | ||
+ | 4.Monitor phase (also called review or implementation) | ||
+ | Designed to insure the proper execution of choice. | ||
+ | |||
=== Related systems === | === Related systems === |
Revision as of 12:51, 13 September 2010
Contents
- 1 General System description
- 2 Brief overview
- 3 Scope of the system
- 4 System origin
- 5 Support for specific issues
- 6 Support for specific thematic areas of a problem type
- 7 Capability to support decision making phases
- 8 Related systems
- 9 Data and data models
- 10 Models
- 11 Decision Support
- 12 Output
- 13 System
- 14 References
General System description
System name: ProgettoBosco Assestamento
Acronym: PB Assestamento
Brief overview
ProgettoBosco is a Data-Driven Decision Support Systems, aimed at optimising the data collection on forest and forest management of Italy. With ProgettoBosco a unique, participated and shared information system effective for all forest typologies existing in Italy was accomplished
Scope of the system
Italian forests are characterized by a wide heterogeneity range of planning systems and rules, which are rather unfeasible to be compared in time and space under a unique perspective, often also within the same administrative Region. Within this context and according to Data-Driven Decision Support Systems definition (Power 2008) “ProgettoBosco” aims at optimising the collection of all data concerning with Italian forests and forest management, by implementing a nationally standardized method and tool for monitoring and supporting forest planning and forest policy choices from a local to a national scale. This means: i) to attain the comparison in time and space of all the collected information; ii) to facilitate data reading also at higher scales; iii) to make much easier the control of forest plans; iv) to standardise on field training education of experts by improving their competences; v) to facilitate the control on the application of the plan’s disposals and rules; vi) to easily keep update forest management plan database.
For this reason, for ProgettoBosco was a priority: - the definition of a minimum and common information level for describing forest areas under a unique technical and management perspective; - the implementation of an information system in order to facilitate the comparison in space and time of basic forest management data; - to provide public administrators and policy makers with a fast and efficient tool to cope with regional, national or international rules (e.g. EU-financing, agreements on biodiversity, sustainability, carbon stock).
System origin
ProgettoBosco is a freeware developed by CRA - Agricultural Research Council (Italy).
The project started up in late-eighties from the experience driven with Emilia Romagna and Umbria Regions where a first forest planning information system was implemented and tested at a local scale. Later on, thanks to the funds of the Italian Agricultural and Forestry Department of the Government Policy Ministry through the national research project named Ri.Selv.Italia, (2001-2007), an homogeneous forest planning system and a management method at national level was implemented. By Ri.Selv.Italia Project, ProgettoBosco has been further implemented and consists nowadays of 8 Regions adopting these experimental management plans, plus 7 more participating so as to make methods and tools compatible with their territorial and administrative peculiarity. Thus, the project involved more than 150 scientists and experts (among researchers, forest managers, technicians belonging to Regional Forest Services), joined in an interdisciplinary team consisting of forest scientists, agronomists, economists, architects, landscape-fauna and phyto-sociology experts, engineers.
Specific tests were set-up to adapt ProgettoBosco's methods and tools to university and professional formation.
At the moment, ProgettoBosco is used as a research tool, in teaching, as well as for practical forest planning purposes.
Support for specific issues
ProgettoBosco supports technicians to produce forest management plans. ProgettoBosco provides a large number of control variables (manipulation possibilities) divided into two main groups of data: one related to management and environmental features of forest compartment and the other one to specific bioecological management information referred to the forest stand (forest stand, tree plantations, shrubs and pasture.
Support for specific thematic areas of a problem type
- Forest planning
- Silvicultural
- Certification
- Conservation
- Development choices / land use zoning
- Policy/intervention alternatives
Capability to support decision making phases
(NOTE I do not quite know what to do with this, as I do not understand it myself, although it seems related to system use)
(Click here to see a more detailed explanation)
- Intelligence (+ explicit description of the support given by the DSS)
- Design (+ explicit description of the support given by the DSS)
- Choice (+ explicit description of the support given by the DSS)
- Monitor (+ explicit description of the support given by the DSS)
Simon's decision making model holds four phases
1.Intelligence phase Consist on surveying the environment for situations that demand decisions. It implies an identification of the problem(s), the collection of information and the establishment of goal and evaluative criteria. 2.Design phase Involves delineating and analyzing various courses of action for the problem identified in the intelligence phase. It implies an enumeration of a combination of feasible alternatives and their evaluation on the basis of the criteria established in the intelligence phase. 3.Choice phase Involves selecting the best alternative. 4.Monitor phase (also called review or implementation) Designed to insure the proper execution of choice.
Related systems
Describe (and/or link to) other systems related
Data and data models
Typical spatial extent of application
Define the scale of use for the application (user defined, regional, multi-owner forest single ownership forest, Multiple scale interaction)
Forest data input
Describe the basic forest input (forest level, stand level, or individual tree level), and appropriate meta-data, such as data provenance (Areal coverage, Sample of plots, stands, Contiguous forest cover). GIS information is to be considered here, namely include cover tyes and type of information (raster or vectorial, necessity of topological information) If necessary describe surrogate sources of information
If necessary describe other types of required data (economic, social)
Type of information input from user (via GUI)
Describe what is the information that the user directly inputs in the system if any): expert knowledge, opinion, goals and production objectives, preferences, stand/site information....
Models
Forest models
Growth, Yield, Carbon, Wood quality, biodiversity and habitat suitability, environmental and external effects (fire, storms, pests, diseases, climate change, etc)
Social models
historical and cultural values of sites, values due to peace and quiet, esthetic values, values due to recreational activities, ethical values): E. g. Recreation, Health, Game
Decision Support
Definition of management interventions
Define what is available for the manager to intervene in the forest: time of harvest, plantations, thinnings, reconversions... Existence of prescription writer, simple enumeration of all possibilities, scenario simulation , etc.
Typical temporal scale of application
Define the temporal scale of the application: E.g., operational and immediate level, Tactical planning (short term) and strategic level.
Types of decisions supported
- Management level
- strategic decisions
- administrative decisions
- operating control decisions
- Management function
- planning decisions
- organizing decisions
- command decisions
- control decisions
- coordination decisions
- decision making situation
- unilateral
- collegial
- Bargaining / participative decision making
Decision-making processes and models
- Logic modeling
- Operations research modeling
- Direct approaches
- Heuristic manipulation of simulation models
- Business modeling
- Simulation (with and without stochasticity)
- Multiple criteria/ranking
- Other
Output
Types of outputs
Types of outputs produced (tables, maps, 3-D visualizations, pre-programmed summaries, etc)
Spatial analysis capabilities
- integrated capabilities
- facilitates links to GIS (wizards, etc.)
- provides standard data import/export formats
- allows spatial analysis (e.g. topology overlays (e.g. multi layering of different maps, selection of objects based on selection criteria, aggregation by attributes (e.g. areas of similar characteristics), Linking by logical means, Statistics by area, analysis with digital terrain model)
Abilities to address interdisciplinary, multi-scaled, and political issues
Evaluate interactions between different basic information types (biophysical, economic, social). Produce coordinated results for decision makers operating at different spatial scales facilitate social negotiation and learning
System
System requirements
- Operating Systems: (Windows, Macintosh, Linux/UNIX, Web-based, Others)
- Other software needed (GIS, MIP packages, etc...)
- Development status
Architecture and major DSS components
Describe the basic architecture of the system in software and hardware. Desktop client-server, web based, as well as the integration with available systems. Basic data flow, focusing on retrieval of required input and propagation and implementations of decisions. Mention its modular and scalability capabilities.
Usage
Describe the level of use: Research level use, Industry use, Government use
Computational limitations
Describe the system limitations: e.g. number of management units, number of vehicles, time horizon
User interface
Describe the quality of user interface and the Prerequisite knowledge for using the system
Documentation and support
Describe the connection to Help-system and possibilities for assistance, as well as the required training and user support levels
Installation
- Prerequisite knowledge: Level of effort to become functional
- Cost: (purchase price, development costs, demonstrated return on investment, cost of use, training costs, licence and maintenance costs)
- Demo: allows the download/utilization of a trial version. If yes, where is it available and what are the trial conditions.
References
Cited references
Power, D. J. 2008. Understanding Data-Driven Decision Support Systems. Information Systems Management 25 (2): 149 – 154