ID 51
From COST Action FP0804: FORSYS
A list of all pages that have property "ID" with value "51".
Since there have been only a few results, also nearby values are displayed.
- The ProgettoBosco working methodology, based on cooperation, successive approximations and + (41)
- To meet the needs of customer - the Forest Service - and to obtain satisfying results the + (42)
- The DSS models built must match the knowledge of the local forest managers, so the ability for local + (43)
- SIPAFIT can act sometimes as a referee to settle arguments among experts, users and stakeholders + (44)
- The use of EMDS allowed the planning team to identify priority area for restoration treatments that + (45)
- Requirement of specialized skills can discourage some potential users + (46)
- The DSS usage enabled the planning team to measure the achievement of the restoration goals + (47)
- Model building was rapid, it was assembling the data that took by far the most time + (48)
- Regular ongoing engagement helped maintain interest of users + (49)
- As the core of forest DSS are models describing the development of trees and stands (growth and + (50)
- Enabling the analyses of several ecosystem services (timber and non-timber resources) in one and the + (51)
- Providing procedures and structure for data flow from selection of field sample, performing field + (52)
- Multiple DSS are often needed to meet complex needs + (53)
- From a management perspective, to avoid the complication of testing something new, the models used + (54)
- Results are always strongly dependent on the quality of the underlying data + (55)
- Forest managers have to analyze how their forest management interventions effect the landscape + (56)
- Despite the widely use and acceptance of the DSS there was still a lack of expertise to + (57)
- Projection of stand development increases knowledge base + (58)
- Analysis at the landscape level allowed the integration of concerns about multiple resources as well + (59)
- The user has to be aware of the possibly large impact that the chosen land indicators and threshold + (60)
- The analysis of the actor network interactions allowed to identify the criticalities to be solved in order to develop the collaborative process + (61)