Modification date 17 September 2013 07:44:01
From COST Action FP0804: FORSYS
A list of all pages that have property "Modification dateThis property is a special property in this wiki." with value "17 September 2013 07:44:01".
Since there have been only a few results, also nearby values are displayed.
- DSS helped document and apply decision criteria consistently, and therefore produced a more + (9 September 2013 15:59:56)
- SIPAFIT sub-systems have been useful in training activities, and can be very useful to explain and + (9 September 2013 16:00:33)
- Case-Lessons by ID with WG themes + (9 September 2013 21:18:33)
- Case-Lessons by WG themes matrix testing + (11 September 2013 15:26:01)
- Case-Lessons by WG themes matrix + (11 September 2013 15:32:51)
- Multiple DSS are often needed to meet complex needs + (13 September 2013 07:51:32)
- Need for new models for the later use of a tool + (15 September 2013 18:36:54)
- The use of structured output (maps, tables and charts) makes the methodology and the results more + (16 September 2013 09:33:37)
- The scope of the modeling project can change significantly during the project + (17 September 2013 07:35:57)
- Users preferred enhanced functionality rather than useability + (17 September 2013 07:39:21)
- Enlarged decision space + (17 September 2013 07:44:01)
- It is necessary to know which data will be use as variables in the models before designing the DSS + (17 September 2013 07:49:37)
- To meet the needs of customer - the Forest Service - and to obtain satisfying results the + (17 September 2013 07:55:08)
- The DSS models built must match the knowledge of the local forest managers, so the ability for local + (17 September 2013 07:57:23)
- Requirement of specialized skills can discourage some potential users + (17 September 2013 08:03:58)
- Model building was rapid, it was assembling the data that took by far the most time + (17 September 2013 08:06:20)
- Regular ongoing engagement helped maintain interest of users + (17 September 2013 08:07:47)
- Despite the widely use and acceptance of the DSS there was still a lack of expertise to + (17 September 2013 08:33:57)
- Projection of stand development increases knowledge base + (17 September 2013 08:37:22)
- Analysis at the landscape level allowed the integration of concerns about multiple resources as well + (17 September 2013 08:40:58)
- Stakeholders contribution in ranking forest functions + (17 September 2013 09:05:32)